Campaign KPIs · Tiguino Block
About the project
Logistics coordination of field services and personnel, linking office planning with block execution. Drilling campaign indicator dashboards and technical-contractual analysis of operational incidents.
- Client:
- Grupo Petrosynergy
- Period:
- December 2025 — May 2026
- Duration:
- 6 months
- Category:
- Petroleum engineering